Construction of F2 Factory in TEDA industrial zone in Sokhna, consisting of a steel structure building with a total area of 4,000 m2 and two story reinforced concrete administration buildings with an area of 800 m2. Scope of works included the soil works, skeleton, steel structure, interior finishes and exterior finishes, MEP and infrastructure works

  • Location of the project: Sokhna
  • Area: 4,800 m2
  • Consultant: Building Consulting Group “Benaa” PhD. Eng. Alaa El Sayed
  • Owner :Egypt TEDA Investment Company
  • Duration : 1 year
  • Contract Date : 2004